|
Before attempting to fit the cubicle(s):
- familiarise yourself with the site drawings and/or the working drawings
supplied with the cubicle(s).
- check that all components and ironmongery are correct.
- Measure and mark the positions of all the partitions on the back
wall.
- Using a plumb line or a spirit level, draw the centre lines on the
back wall and floor.
- Fix 3 "U" brackets for each partition on the centre line
using the rawl plugs and screws provided. Note that if fitting the FOREST
range the partitions are fixed to the wall using the flange of the aluminium
extrusion already fitted to the partition. If fitting the ATOLL range
then the wall channel is used instead of the brackets.
- Using a 150mm block to support the partition, insert the partition
into the brackets. If the wall is not straight you will need to either
put packing behind the brackets or scribe the partition to the wall.
- Once you have the partition in place then drill through the partition
using the hole in the bracket as a guide and fix using the through bolts
provided. If fitting the Atoll range then drill through using the holes
in the wall channel as a guide and fix using the through bolts provided.
- Disassemble the hinges and fix the female half of the hinge to the
pre-drilled fascias using the "T" nuts provided.
- Fit the leg to the pre-drilled fascias using the through bolts provided.
- Mark the centre line on the back of the centre fascia and along the
edge of any end fascias.
- Fix 3 "U" brackets to each fascia using the 5/8" screws
provided. If fitting the ATOLL range then the wall channel is used instead
of the brackets.
- Offer the fascia up to the partition, drill through the partition
using the hole in the bracket as a guide and fix using the through bolts
provided. If fitting the FOREST range then use the flange on the aluminium
extrusion to fix fascia to the partition. If fitting the ATOLL range
then use the holes in the wall channel as a guide, drill through the
partition and fix using the through bolts provided. After installation
of the fascia, refer to the drawing supplied, mark the appropriate headrail
position, pre-drill and fix the headrail.
- Fix the leg to the floor using the rawl plugs and screws provided.
Cut to length the capping rail and fix through the top of the fascias
making sure the door openings are correct. Any adjustments because of
uneven floors can be made on the legs prior to final fixing.
- Disassemble the indicator bolt and fit to the pre-drilled door.
- Fix the male half of the hinges to the pre-drilled door edge.
- The door can now be lifted onto the hinged fascias and locked in place
using the anti-lift off screw. By adjusting the nylon bushes the door
can be set to fall shut or fall open. The keep and the rubber buffers
can now be fixed to the inside of the clashing fascias. Any accessories
can now be fitted to the cubicle/s.
Finally, the cubicle/s can be wiped down using a damp cloth with a mild
non-abrasive detergent.
|